Overview
Fusion for Energy has published a competitive procedure with negotiation (procedure identifier F4E-OPE-1405) for the integration, installation, inspection, testing support and supply of hardware for the JT-60SA actively cooled divertor, combining on-site services (storage, assembly, welding, installation, inspection) and manufacture/supply of diagnostic and divertor components. The tender was published in the TED on 27 October 2026 and the non-electronic submission deadline is 30 November 2026 at 16:00 Brussels time. The contract is a procurement for services including hardware supply (main CPV 71630000) and the opportunity record does not state an estimated total value. Interested economic operators should consult the EU Funding & Tenders Portal and the Fusion for Energy buyer profile for the full tender dossier, submission instructions and eligibility requirements.
Partner Search
Find collaboration partners for this call
What You Offer
Describe your expertise here...
You Are Looking For
Describe what you seek here...
Highlights
What is funded / procured
Scope summary
A contract combining services and hardware for the integration of the JT-60SA actively cooled divertor. Services cover storage, assembly, welding, installation and inspection of divertor and diagnostic components. Hardware procurement or manufacture includes diagnostic sensors and fittings such as Langmuir probes, Halo current (Rogowski) coils, thermocouples, gas injection pipes, electrical shunts, diagnostic connectors, divertor fasteners and alignment components, and main water pipe caps.
Who can apply:Commercial contractors or suppliers with demonstrated capability in mechanical assembly, welding, inspection and manufacture/supply of diagnostic hardware for high-precision engineering projects (public tender issued by Fusion for Energy).
- 1Services: storage, assembly, welding, installation, inspection
- 2Hardware: probes, coils, thermocouples, pipes, shunts, connectors, fasteners, alignment components, pipe caps
| Procedure type | Competitive procedure with negotiation |
|---|---|
| Contract type | Services |
| Main CPV | 71630000 - Technical inspection and testing services |
| Submission method | Non Electronic |
| TED publication date | 27 October 2026 |
| Deadline for receipt of tenders | 30 November 2026 16:00 (UTC) |
Estimated total value not specified in the published summary. Bidders should consult the full tender dossier and buyer profile for procurement rules, qualification requirements and submission instructions Opportunity details 1.
Footnotes
- 1Official tender page and documents are available at the EU Funding & Tenders Portal link above.
Find a Consultant to Support You
Breakdown
Basic procurement facts
Summary description
This is a competitive negotiated public procurement issued by Fusion for Energy (F4E) titled Integration of the JT-60SA Actively Cooled Divertor, procedure identifier F4E-OPE-1405. The contract scope is divided into two principal parts: services and hardware. The services portion covers storage, assembly, welding, installation and inspection of the divertor components and associated diagnostic components. The hardware portion covers production and/or acquisition of diagnostic and divertor items including Langmuir probes; Halo current (Rogowski) coils; Thermocouples; Gas injection pipes; Electrical shunts; Diagnostic connectors; Divertor fasteners; Divertor alignment components; and Main water pipe caps. The contract is classified under CPV code 71630000 Technical inspection and testing services and is procured via a competitive procedure with negotiation. The tender was published in the TED on 27 October 2026 and the submission deadline is 30 November 2026 at 16:00 (non-electronic submission).
Submission method and dates:Submission method: Non Electronic. TED publication date: 27 October 2026. Time limit for receipt of tenders / Closing date: 30 November 2026 16:00 1.
Procedure and contract type:Procedure type: Competitive procedure with negotiation (NEGOTIATED_COMPETITIVE). Contract type indicated as Services. Main CPV: 71630000 - Technical inspection and testing services.
Detailed eligibility, scope and application information
The published tender text provides the following explicit requirements and scope elements. The contracting authority is Fusion for Energy (F4E). The contract work splits into service tasks and supply tasks. Service tasks: storage of divertor and diagnostic components; mechanical assembly of divertor units; welding operations where required for integration; installation of assembled divertor units into the JT-60SA vessel or designated integration fixtures; and inspection and quality verification of divertor components and diagnostic components. Hardware tasks: manufacture and/or supply of Langmuir probes, Halo current (Rogowski) coils, Thermocouples, Gas injection pipes, Electrical shunts, Diagnostic connectors, Divertor fasteners, Divertor alignment components, and Main water pipe caps. The tender documentation and Q&A are available from the buyer profile and the IT procurement page referenced in the tender notice.
Estimated total value:The public tender record lists an Estimated total value field but does not provide a numeric amount in the scraped content. The tender therefore has no specific funding amount disclosed in the scraped extract.
- 1Eligible Applicant Types: The tender targets economic operators capable of performing complex mechanical integration, welding and supply of diagnostic hardware. Suitable applicant types include: SMEs and large enterprises active in precision mechanical assembly and manufacturing; specialist suppliers of diagnostic probes and sensors (Langmuir probes, thermocouples, Rogowski coils); engineering contractors with experience in fusion or large experimental facility integration; research institutes or university spin-offs with industrial contracting capacity; consortia or joint ventures combining manufacturing and on-site installation expertise; and accredited inspection/testing service providers. The procurement text does not list individuals as eligible applicants. Public bodies may participate only if consistent with procurement rules. The contracting authority is an EU body (F4E) and typical eligible economic operators are those allowed under EU procurement rules.
- 2Funding Type: This is a public procurement / contract for services and supply. The primary financial mechanism is a procurement contract where the buyer pays the successful contractor for delivered services and hardware.
- 3Consortium Requirement: The tender documentation does not explicitly mandate either single-entity-only or consortium-only bids. Given the integrated scope (manufacture plus on-site assembly and welding) bidders may present a single legal entity or a consortium / subcontracting arrangement. Therefore requirement: other — single or consortium bids are possible depending on the tender rules in the full procurement documents.
- 4Beneficiary Scope (Geographic Eligibility): The scraped notice does not enumerate eligible countries. As an F4E procurement it is expected to follow EU procurement rules and to be open to economic operators from EU Member States and typically EEA and other countries deemed eligible under the contract notice, but the exact list of eligible countries must be confirmed in the full tender documentation. The record does not explicitly restrict to a single country.
- 5Target Sector: The sector targeted is fusion energy and experimental fusion device engineering: specifically manufacturing, integration and diagnostics for fusion reactor components. It also covers mechanical engineering, instrumentation, test/inspection services and precision fabrication.
- 6Mentioned Countries: No specific countries are explicitly mentioned in the scraped content. The contracting authority is Fusion for Energy (F4E), an EU body. Geographic region implied: European Union / international suppliers eligible under EU procurement rules.
- 7Project Stage: The work is in the integration and installation phase for JT-60SA's actively cooled divertor units. Expected maturity: demonstration / assembly / integration stage (technical implementation, testing and commissioning activities rather than early-stage research).
- 8Funding Amount: Not specified in the scraped content. The estimated total value field is empty in the provided extract and no budget figure is shown.
- 9Application Type: Open competitive call for tenders with negotiated procedure. Submission method: Non-electronic physical submission (paper or other non-electronic means) as indicated in the call. Open for submission to bidders until the stated deadline.
- 10Nature of Support: The successful bidder(s) will receive monetary payment under a procurement contract (i.e., money for deliverables and services) in return for performing the works and supplying the hardware.
- 11Application Stages: The procurement is a competitive procedure with negotiation. Typical stages for this procedure are: 1) submission of tender(s) by the deadline; 2) examination of tenders and possible clarification/negotiation phase(s) with one or more bidders; 3) award decision and contract signature. Thus applicants should prepare for at least 2 to 3 stages including negotiation but the exact number and structure are defined in the tender rules.
- 12Success Rates: The scraped content does not provide historic success rates or number of awards. Success rate will depend on number and quality of bids; public procurement success rates are typically low for large technical contracts but no specific success probability can be given from the available information.
- 13Co-funding Requirement: As a service and supply contract procured by a buyer, there is no co-funding requirement from applicants. The contractor is paid according to contract terms. Co-funding is therefore not applicable, though bidders must finance their bid preparation and any performance bonds or guarantees required.
- 14Templates: The portal references standard Tender e-Procurement templates and the buyer profile includes downloadable documentation and Q&A. The typical structure bidders should expect in the application / tender package: administrative documentation (legal entity registration, power of attorney, financial statements), exclusion and selection criteria evidence (litigation, bankruptcy, capacity, certifications), technical offer (methodology, work plan, integration approach, welding procedures, QA/QC and inspection plans, health and safety plan, manufacturing drawings and material compliance), personnel and key expert CVs, past performance / references for similar integration or manufacturing projects, commercial offer (price breakdown by service and hardware items, unit prices for hardware components, payment schedule), compliance declarations and any required performance guarantees or bonds. Bidders should consult the full tender dossier for the exact forms and required annexes available on the buyer profile and TED/portal documents.
- 15Technical and quality expectations: Based on the scope, bidders are expected to have capabilities in vacuum/cleanroom-compatible assembly practices (if applicable), specialised welding for fusion-class components, mechanical alignment and fixturing for divertor units, testing and inspection instrumentation (electrical and thermal), traceable supply chains for sensors (Langmuir probes, thermocouples), and expertise in high-pressure / cooling water system components (main water pipe caps and gas injection lines). Quality assurance, non-destructive testing, traceability of materials, adherence to relevant standards and documentation for acceptance testing will be required and detailed in tender documents.
| Field | Extracted information |
|---|---|
| Tender identifier | F4E-OPE-1405 |
| Buyer | Fusion for Energy (F4E) |
| Procedure type | Competitive procedure with negotiation |
| Contract type | Services (including supply of diagnostic hardware) |
| Main CPV | 71630000 - Technical inspection and testing services |
| Publication date (TED) | 27 October 2026 |
| Submission deadline | 30 November 2026 16:00 (Non-electronic) |
| Scope (high level) | Storage, assembly, welding, installation, inspection; supply/manufacture of Langmuir probes, Rogowski coils, thermocouples, gas injection pipes, electrical shunts, diagnostic connectors, fasteners, alignment components, main water pipe caps |
| Estimated total value | Not specified in scraped content |
Recommended bidder preparation checklist
Prospective bidders should obtain the full tender dossier from the buyer profile and TED notice, review selection and award criteria, and prepare the following:
- 1Administrative compliance documents (registration, VAT, legal status, mandated signatory).
- 2Evidence for eligibility and absence of grounds for exclusion (criminal, bankruptcy, conflicts of interest).
- 3Financial capacity and stability documents (audited accounts, bank references if requested).
- 4Technical proposal describing methods for storage, assembly, welding, testing, installation and inspection; work plan and schedule tied to JT-60SA integration milestones.
- 5Quality assurance and welding procedure specifications; NDT and inspection methodology; traceability procedures for supplied hardware.
- 6Detailed bill of quantities and commercial offer including unit prices per hardware item and lump sums for service phases, plus proposed payment milestones.
- 7Resumes and qualifications of key personnel and supervisors, including welding certificates and QA inspectors.
- 8List of subcontractors and suppliers where applicable and subcontracting arrangements or consortium agreements.
- 9Any required performance guarantees, advance payment guarantees, or bonds as stated in the tender documentation.
- 10Responses to any technical compliance matrices or templates included with the tender e-Procurement package.
Because submission is non-electronic and the procurement uses a negotiated procedure, bidders should prepare for potential clarifications and a negotiation phase after initial submission; timely responsiveness to Q&A and requests from the contracting authority is critical.
Concluding summary
This procurement seeks an industrial contractor or consortium able to integrate and support the actively cooled divertor for the JT-60SA facility, delivering both on-site services (storage, assembly, welding, installation, inspection) and manufactured diagnostic/hardware components (Langmuir probes, Rogowski coils, thermocouples, gas injection pipes, electrical shunts, connectors, fasteners, alignment parts, water pipe caps). It is a negotiated competitive tender managed by Fusion for Energy, published 27 October 2026 with a non-electronic submission deadline of 30 November 2026 at 16:00. The contract is service-focused with hardware supply elements; the financial terms are those of a procurement contract and no co-funding by bidders is required. Specific eligibility rules, award criteria, required certificates, and any country eligibility lists must be checked in the full tender dossier and buyer profile. Interested bidders should download the complete documentation from the contracting authority, follow the tender templates and Q&A, and prepare a comprehensive administrative, technical and commercial offer including quality and safety plans and evidence of manufacturing and welding capability.
For official documents and downloads consult the buyer profile and the procurement page referenced in the tender notice; bidders must rely on the full procurement documentation for binding instructions and exact submission requirements F4E Buyer Profile and Tender Page Tender details on EU portal.
Footnotes
- 1Deadlines and submission methods are taken directly from the tender notice: TED publication date 27 October 2026; time limit for receipt of tenders 30 November 2026 16:00 (non-electronic submission). Consult the official tender dossier for confirmation and any time zone clarifications.
Short Summary
Impact Deliver and integrate an actively cooled divertor (with associated diagnostics and fittings) into the JT-60SA tokamak to enable safe plasma exhaust management, cooling and diagnostic measurements during operation. | Impact | Deliver and integrate an actively cooled divertor (with associated diagnostics and fittings) into the JT-60SA tokamak to enable safe plasma exhaust management, cooling and diagnostic measurements during operation. |
Applicant Companies with proven capability in precision mechanical assembly and integration, specialist welding and fabrication, quality assurance and inspection (including NDT), and procurement/manufacture of diagnostic sensors and instrumentation. | Applicant | Companies with proven capability in precision mechanical assembly and integration, specialist welding and fabrication, quality assurance and inspection (including NDT), and procurement/manufacture of diagnostic sensors and instrumentation. |
Developments Integration, installation, testing and commissioning of an actively cooled divertor system and the manufacture/supply of associated diagnostic hardware for a fusion research tokamak. | Developments | Integration, installation, testing and commissioning of an actively cooled divertor system and the manufacture/supply of associated diagnostic hardware for a fusion research tokamak. |
Applicant Type Profit-making engineering contractors and suppliers (SMEs and large corporations) with industrial contracting capacity in precision fabrication, welding, instrumentation and onsite integration. | Applicant Type | Profit-making engineering contractors and suppliers (SMEs and large corporations) with industrial contracting capacity in precision fabrication, welding, instrumentation and onsite integration. |
Consortium Not mandated in the published summary — bids may be submitted by a single legal entity or by a consortium/subcontracting arrangement depending on the full tender rules. | Consortium | Not mandated in the published summary — bids may be submitted by a single legal entity or by a consortium/subcontracting arrangement depending on the full tender rules. |
Funding Amount Not specified in the published record; this is a procurement contract where the buyer pays the successful contractor and the estimated total value is not stated. | Funding Amount | Not specified in the published record; this is a procurement contract where the buyer pays the successful contractor and the estimated total value is not stated. |
Countries Implicitly targeted at operators eligible under EU procurement rules (EU Member States and typically EEA/other countries specified in the tender documents); contracting authority is Fusion for Energy (EU body). | Countries | Implicitly targeted at operators eligible under EU procurement rules (EU Member States and typically EEA/other countries specified in the tender documents); contracting authority is Fusion for Energy (EU body). |
Industry Fusion energy / experimental fusion device engineering (precision mechanical engineering, diagnostics, and nuclear/fusion infrastructure integration). | Industry | Fusion energy / experimental fusion device engineering (precision mechanical engineering, diagnostics, and nuclear/fusion infrastructure integration). |
Additional Web Data
Executive summary
This is a public procurement opportunity issued by Fusion for Energy under procedure identifier F4E-OPE-1405. It is a contract for the integration, installation, inspection, testing support and associated supply of hardware for the actively cooled divertor of the JT-60SA fusion research facility. It is not a grant, so applicants should not expect grant-style co-financing, fixed funding rates or reimbursement of eligible costs. The successful contractor will be paid under the terms of the resulting procurement contract. 1
The procurement combines technical services with the production or acquisition of specialised divertor and diagnostic components. The stated submission deadline is 30 November 2026 at 16:00 Brussels time. The procedure is a competitive procedure with negotiation and the submission method is identified as non electronic. 1
Opportunity identification
The principal information available for the opportunity is set out below.
| Field | Information |
|---|---|
| Opportunity title | Integration of the JT-60SA Actively Cooled Divertor |
| Contracting organisation | Fusion for Energy, also known as F4E |
| Procedure identifier | F4E-OPE-1405 |
| Opportunity type | Call for tenders |
| Procurement procedure | Competitive procedure with negotiation |
| Contract type shown on the portal | Services |
| Main CPV code | 71630000, Technical inspection and testing services |
| Submission method | Non electronic |
| Status | Open for submission |
| TED publication date | 27 October 2026 |
| Tender deadline | 30 November 2026 at 16:00 Brussels time |
| Estimated total value | Not stated in the available opportunity record |
| Framework agreement or DPS | No such arrangement is identified in the available record |
| Authoritative portal record | EU Funding and Tenders Portal |
What the procurement is about
The contract supports the integration of an actively cooled divertor system for JT-60SA. A divertor is a technically critical tokamak subsystem that manages plasma exhaust and heat loads. The opportunity record describes a combined scope covering physical handling and integration activities together with the supply of components needed for divertor operation, alignment, cooling, diagnostics and electrical measurement.
The work is divided into two principal elements.
Service scope
The service element includes storage, assembly, welding, installation and inspection of divertor components and diagnostic components. The successful contractor is therefore likely to require capability in controlled component handling, mechanical assembly, precision installation, welding, quality assurance, inspection and coordination with a major fusion-device integration environment.
Hardware scope
The hardware element involves the production and or acquisition of the following items:
- Langmuir probes
- Halo current Rogowski coils
- Thermocouples
- Gas injection pipes
- Electrical shunts
- Diagnostic connectors
- Divertor fasteners
- Divertor alignment components
- Main water pipe caps
Who can apply
The available record does not state a closed applicant category, minimum turnover, nationality condition, consortium rule, subcontracting limit, financial capacity threshold or technical selection threshold. As this is a public tender rather than a grant call, the relevant concept is the eligibility and admissibility of economic operators submitting a tender, rather than eligibility of grant beneficiaries.
Potential applicants are likely to include established industrial companies, engineering contractors, specialist welding and fabrication companies, fusion or nuclear technology suppliers, technical inspection organisations, and consortia combining integration, manufacturing, diagnostics and quality assurance capabilities. This is an assessment of the technical scope and does not replace the official tender documents.
Applicants should verify in the procurement documents whether individual companies may bid alone, whether joint bids or temporary groupings are permitted, and whether subcontractors may perform critical tasks. They should also confirm any requirements concerning exclusion grounds, professional standing, economic and financial capacity, technical capacity, quality systems, site access, safety, export controls and prior experience with comparable scientific, nuclear or high precision equipment.
Funding and commercial structure
No grant budget, maximum grant amount, co-financing rate or eligible-cost methodology is published in the available record. The portal field for estimated total value is blank. Applicants should therefore not use Horizon Europe grant assumptions when preparing a bid.
The commercial offer is expected to be submitted against the contracting authority's pricing and contractual requirements. The tender documents should be checked for the applicable price structure, including whether prices must be fixed, whether options or provisional items are included, how hardware and services are priced, whether travel and on-site costs are reimbursable, and whether taxes, duties, insurance and delivery costs must be included.
The final contract value cannot be reliably determined from the published summary. It should not be inferred from the CPV code or from the absence of a value in the portal record.
Procedure and evaluation implications
The use of a competitive procedure with negotiation indicates that the contracting authority may evaluate initial tenders and negotiate specified aspects with one or more tenderers before requesting final tenders. The exact negotiation stages, number of candidates or tenderers invited, permitted changes to tenders, evaluation methodology and award criteria are not provided in the available summary and must be taken from the official tender specifications.
The published main CPV code concerns technical inspection and testing services, but the described scope is broader and includes integration work and hardware supply. Bidders should therefore read the full technical specification and not limit their response to inspection services alone.
Likely capability areas to demonstrate
- Experience in assembly and integration of complex mechanical or scientific equipment
- Qualified welding and fabrication capability appropriate to the materials and applicable specifications
- Precision alignment, dimensional control and installation capability
- Technical inspection, non destructive examination and quality assurance arrangements
- Manufacture or procurement of specialised diagnostics and instrumentation
- Traceability of materials, components, inspections and manufacturing records
- Capability to manage storage, handling, packaging and preservation of sensitive components
- Experience working in controlled industrial, nuclear, fusion or large research infrastructure environments where relevant
- Project management arrangements for coordinating service activities and hardware deliveries
- Health, safety, environmental, security and site access procedures
- Ability to comply with F4E technical, contractual, documentation and acceptance requirements
Duration and place of performance
The available opportunity summary does not state the contract duration, commencement date, completion date, milestones, delivery schedule or place of performance. These details are material to bid planning and should be confirmed in the tender specifications, draft contract and any technical annexes.
Because the scope includes storage, installation, welding, inspection and integration, applicants should assess whether performance will require access to an F4E or JT-60SA site, attendance at supplier premises, staged deliveries, coordinated shutdown or installation windows, or acceptance testing at a designated facility. These points remain unconfirmed in the published summary.
Submission requirements
The portal identifies the submission method as non electronic. Applicants should not assume that uploading a standard proposal through the Funding and Tenders Portal is sufficient. The official procurement instructions should be followed for the required physical or dedicated e procurement submission route, packaging, copies, signatures, file formats, delivery address and receipt requirements.
The associated supplier procurement page identifies Fusion for Energy's public tender environment and should be checked together with the portal record for the tender package, templates and submission instructions. 2
At minimum, a compliant tender is likely to require the following categories of information, subject to the official documents:
- Administrative identification of the tenderer and any consortium members
- Declarations concerning exclusion grounds and eligibility
- Evidence of professional, economic and financial capacity
- Technical proposal addressing every service and hardware requirement
- Organisation, staffing and project management plan
- Quality assurance, inspection, testing and traceability plan
- Welding, manufacturing and supply-chain information where applicable
- Schedule, milestones and resource plan
- Risk, safety, security and environmental management information
- Pricing schedules and completed contractual forms
- Evidence of relevant experience and references
- Details of subcontractors, suppliers and critical manufacturing activities
Key conditions and risks for applicants
- The deadline is strict and the non electronic submission method creates a material risk of late delivery, incomplete copies, invalid signatures or use of an incorrect delivery channel.
- The scope combines services and hardware, so a bidder must demonstrate both execution capability and reliable supply-chain control or clearly identify qualified partners.
- Welding, inspection, alignment and diagnostic integration are likely to be acceptance-critical activities. Missing documentation, traceability or test evidence could affect acceptance and payment.
- Specialist items may have long lead times. Early confirmation of suppliers, technical interfaces, materials, manufacturing capacity and delivery constraints is advisable.
- The tender may impose detailed intellectual property, confidentiality, data rights, configuration control and document retention obligations. These cannot be confirmed from the summary.
- Site access, safety clearance, export control, insurance and liability requirements may affect non-EU or non-local suppliers and should be reviewed before forming a consortium.
- The absence of a published estimated value means that financial viability, working capital and the treatment of advance payments or milestone payments must be assessed from the draft contract.
- The technical scope may require strict interface management with JT-60SA systems and other project contractors. Applicants should identify assumptions and interface dependencies explicitly in their tender.
Recommended bid preparation approach
- 1Obtain and review the complete tender package, including the technical specification, administrative instructions, draft contract, price schedules, quality requirements, drawings and questions and answers.
- 2Create a compliance matrix mapping every requirement to a specific tender response, evidence document, responsible contributor and submission location.
- 3Decide whether to bid alone or form a consortium covering integration, welding, inspection, diagnostics, procurement and project management capabilities.
- 4Confirm the non electronic submission route and create an internal delivery plan with buffer time before the 30 November 2026 deadline.
- 5Engage critical suppliers early for Langmuir probes, Rogowski coils, thermocouples, gas injection pipes, electrical shunts, connectors and specialised mechanical parts.
- 6Prepare a realistic integrated schedule covering procurement, manufacturing, inspection, storage, assembly, installation, testing and acceptance.
- 7Establish a quality and traceability system covering materials, weld procedures, qualifications, inspection records, non conformities, calibration and final dossiers.
- 8Review contractual exposure, including liquidated damages, warranty, liability, intellectual property, confidentiality, insurance, termination and payment provisions.
- 9Submit clarification questions through the official channel before the applicable question deadline and monitor all issued amendments.
Information not available in the published summary
The following items should be treated as unresolved until confirmed in the full tender documents:
- Estimated contract value
- Contract duration and timetable
- Place or places of performance
- Detailed eligibility and exclusion requirements
- Minimum turnover and financial capacity
- Required references and minimum technical experience
- Consortium and subcontracting rules
- Detailed award criteria and weighting
- Negotiation timetable and procedure
- Technical standards, drawings and interface specifications
- Required staff qualifications and welding certificates
- Security, safety, access and export control requirements
- Payment schedule and price adjustment provisions
- Warranty, liability and intellectual property terms
- Formal non electronic submission arrangements
Overall assessment
This is a technically specialised procurement suited to organisations with demonstrated capability in fusion, nuclear, scientific infrastructure, high precision mechanical integration, specialist diagnostics, welding and inspection. The combined service and hardware scope creates opportunities for a capable prime contractor or a well integrated consortium, but it also increases coordination, quality and delivery risks.
The opportunity should be approached as a contract delivery and compliance exercise rather than as an EU funding application. The most important immediate actions are to obtain the complete tender package, confirm the non electronic submission process, identify the commercial value and contract duration, map all technical interfaces, and secure qualified suppliers and specialist partners before finalising the bid.
Official sources
The authoritative opportunity record is the EU Funding and Tenders Portal tender page. The related Fusion for Energy supplier procurement page is also identified in the opportunity data and should be used to locate the procurement documents and submission instructions. 1 2
Official portal record:Integration of the JT-60SA Actively Cooled Divertor, F4E-OPE-1405
Related procurement page:Fusion for Energy public tenders
Footnotes
- 1EU Funding and Tenders Portal opportunity record for Integration of the JT-60SA Actively Cooled Divertor, procedure identifier F4E-OPE-1405. The record provides the title, scope, procedure, contract type, CPV code, submission method and deadline. EU Funding and Tenders Portal
- 2Fusion for Energy public tender environment identified in the opportunity record. The full procurement documents and any specific submission instructions should be verified there. Fusion for Energy public tenders
Update Log
No updates recorded yet.
Discover with AI
Let our intelligent agent help you find the perfect funding opportunities tailored to your needs.
EU Grant Database
Explore European funding opportunities in our comprehensive, up-to-date collection.
Stay Informed
Get notified when grants change, deadlines approach, or new opportunities match your interests.
Track Your Favorites
Follow grants you're interested in and keep them organized in one place. Get updates on changes and deadlines.
On site support activities and supply of Test Coils
Fusion for Energy (F4E) has published tender F4E OMF 2074 for on-site technical support for ITER magnets (preservation, preventive maintenance, cold testing and assembly) and the manufacture and supply of test coils. The procedure is a c...
Supply of an inert glovebox chain for the JRC Karlsruhe
European Commission DG JRC (JRC Karlsruhe) is procuring the supply, delivery, installation, commissioning and warranty of an inert glovebox chain under procurement EC-JRC/KRU/2026/OP/6575 with an estimated total contract value of €650,00...
Durchführung von Strahlenschutzaufgaben in Rückbauprojekten
The Joint Research Centre (European Commission) invites requests to participate in a restricted two-stage procurement to award a single framework agreement for radiation protection services at JRC Karlsruhe with a maximum ceiling of €600...
Supply and maintenance of one Liquid Scintillation Counter for LMR
The European Commission, Directorate General Joint Research Centre (JRC), has published a public procurement to supply, install, commission, test, train and provide 48 months warranty/maintenance for one low background liquid scintillati...
Quality Control Inspectors for ITER and Broader Approach and Roadmap Projects
Fusion for Energy (F4E) has published an open procurement (procedure F4E OMF 2050) for provision of technical quality control inspection services (CPV 71631000) including resident, itinerant and spot inspectors at contractors and subcont...
Ship design and safety assessment of nuclear fission technologies for maritime applications
European Maritime Safety Agency is procuring a 48 month framework contract to deliver technical studies on ship design, reactor integration, coupled multi‑physics simulations and safety assessments for maritime nuclear fission technologi...
Durchführung von Aufbau und Änderung von Elektroinstallationen an Handschuhkästen, heißen Zellen, Labors und im Gebäude im JRC Karlsruhe
The European Commission Joint Research Centre (JRC) Karlsruhe has published a public procurement for a single-supplier services framework agreement to carry out installation, modification and related electrical works on glove boxes, hot...
AO 26 023 — Contrat cadre de Travaux de Techniques Spéciales dans les bâtiments du Parlement européen à Bruxelles
AO 26 023 is an open procurement for a framework contract to deliver special technical works and related services in the European Parliament buildings in Brussels, covering HVAC, plumbing and sanitary installations, electrical systems fo...
Maintenance Services for Perkin Elmer Scientific Instruments
The European Commission Joint Research Centre (JRC) in Ispra, Italy has published an open tender (EC-JRC/IPR/2026/OP/5527) for preventive and corrective maintenance, repairs, operational qualification and technical support for Perkin Elm...
mid-throughput next generation genome sequencer
The European Commission Joint Research Centre (DG JRC) has published an open public procurement (procedure EC-JRC/GEE/2026/OP/5609) for the supply, installation, training, 24-month warranty and multi-year maintenance of a mid-throughput...
Maintenance services for Applied Biosystems (Life Technologies) Scientific Instruments
The European Commission Joint Research Centre (JRC) seeks a single contractor under a framework agreement to provide preventive and corrective maintenance, calibration, qualification, repair and technical support for Applied Biosystems /...
IT-Sicherheitsberatung für das JRC Karlsruhe
The European Commission Joint Research Centre (JRC) Karlsruhe invites requests to participate in a restricted two-stage procurement (EC-JRC/KRU/2026/RP/2931, TED 699278-2026) for IT security consultancy to revise and support implementati...